---
title: Change management
summary: How to safely change contracts, schemas, systems and cross-domain flows in the Acme Inc catalog.
owners:
  - dboyne
badges:
  - content: Operations
    backgroundColor: gray
    textColor: gray
---

Changes should start with ownership and blast radius. A small service implementation change may not affect the catalog. A schema or flow change usually does.

## Contract changes

Before changing a command, event or query:

1. Identify the producer and all consumers.
2. Check whether the change is backward compatible.
3. Update the schema and resource summary.
4. Update affected flow pages.
5. Coordinate rollout with consumer owners.

High-risk contracts include [[event|cart-checked-out]], [[command|reserve-inventory]], [[command|authorize-payment]], [[command|create-order]], [[event|order-created]] and [[event|review-published]].

## System changes

When a system adds a service or data store, update the system page and any domain page that lists that system. If the change alters ownership of data, update the data ownership page too.

## Flow changes

For flows such as [[flow|place-an-order]], [[flow|checkout-saga]], [[flow|product-search-indexing]] and [[flow|review-submission]], update the diagram and the narrative together. A diagram without the operating rules is not enough for on-call or onboarding.

## Decision records

Use ADRs when a decision changes a long-lived pattern. The Product Catalog System already documents key decisions such as [[adr|adr-001-use-transactional-outbox]], [[adr|adr-002-postgres-as-system-of-record]] and [[adr|adr-003-offload-async-work-to-worker]].
